Work Party Update – 8th May 2018

This evening, a vent outside the church which had become loose was secured back onto the building. We lifted a floorboard in the church to investigate a dip in the flooring which turned out to be a small bridge of wood over a heating pipe which needed replaced. Work was finished on the re-painting of the disabled toilet in the belfry.