«

»

Work Party Update – 28th April 2015

Tonight we secured 4 of the leg curtains to the wood that is fixed to the overhead frame. The frame that was high at the main curtain side was lowered therefore dropping the leg we fitted last week almost to the floor. The other 4 of the leg curtains were fitted – 2 on each side. Next week, the final 2 legs will be fitted and the pinning up of the main curtains started.